09

2022-04

Aosen Updates | Aosen Steel's High-Quality Development Planning Project Kicks Off

Wang Dayong, Special Researcher at the Hebei Provincial Government Counselor's Office; Shi Huieen, Director of the Development Research Division at the Metallurgical Industry Economic Development Research Center; Chen Yu, Director of the Low-Carbon Research Institute; and Zhao Nan, Senior Engineer from the Development Research Division, visited Aosen Group. There, they engaged in discussions and exchanges with Cao Yanan, Executive Director of Aosen Group; Wang Bing'an, General Manager; Pan Cheng, Executive Vice President; Su Xiaofeng, Chief Engineer of the Group; Hou Shunyi, CFO; Li Quanbao, Head of Human Resources; He Bin, Executive Vice President of Administration; Wang Yesheng, Executive Vice President of Production; Zhao Song, Executive Vice President of Supply Chain and Marketing; Li Huanfeng, Executive Vice President of Environmental Protection; and Wang Chaolong, Sales Director—focusing on how the company can accelerate its transformation and upgrading to achieve high-quality development.

2022-04-09

25

2022-03

Fueling youthful passion, pushing boundaries to reach new heights—Aosen Group’s first-ever internal competition event in 2022 concludes successfully.

This recruitment process adheres to the principles of "open selection, voluntary application, and competitive appointment," with no barriers to entry and a focus on merit rather than seniority—fully embodying the talent philosophy of "matching the right person to the right role and ensuring everyone excels in their area of expertise." Participants include seasoned management professionals, as well as dedicated frontline staff who are deeply rooted in their roles and well-versed in technical matters. Joining them are also ambitious young talents from across various business units—individuals who are bold, innovative, and eager to take on challenges. Driven by their passion for their careers and deep affection for Aosen, these candidates enthusiastically stepped forward to participate in the competition. During the presentations, each candidate delivered speeches focusing on key topics such as their personal work experience, their understanding of the positions they’re applying for, and their vision and plans for future roles. Meanwhile, the panel of judges engaged in thorough questioning and analysis, probing candidates’ insights into their roles and their proposed career strategies. This interactive exchange not only helped the candidates refine their ideas and clarify their paths forward but also sparked dynamic discussions and lively debates throughout the event.

2022-03-25

31

2020-12

Public Announcement on Environmental Impact Assessment Public Participation for the 3×240th Boiler Fuel Substitution and Retrofit Project of Xinji City Aosen Steel Group Co., Ltd.

In accordance with the requirements outlined in the "Measures for Public Participation in Environmental Impact Assessments" (Ministry Order No. 4) issued by the Ministry of Ecology and Environment, we are hereby announcing the progress of the fuel-replacement technology upgrade project for three 240th boilers at Xinji Aosen Steel Group Co., Ltd., along with the environmental impact assessment. This initiative aims to widely gauge public sentiment toward the project as well as gather valuable feedback and suggestions on environmental protection measures, ensuring transparency and inviting public oversight. --- **I. Project Overview** - **Project Name:** Fuel-Replacement Technology Upgrade Project for Three 240th Boilers at Xinji Aosen Steel Group Co., Ltd. - **Project Developer:** Xinji Aosen Steel Group Co., Ltd. - **Location:** East of Zhao Ma Village, Nanzhiqiu Town, Xinji City, within the Xinji Circular Economy Industrial Park. - **Project Description:** The existing three 240 t/h high-temperature, high-pressure circulating fluidized-bed biomass boilers will be retrofitted into hybrid combustion boilers that utilize both semi-coke and blast-furnace gas. --- **II. Contact Information for the Project Developer** - **Developer:** Xinji Aosen Steel Group Co., Ltd. - **Contact Person:** Manager Song - **Phone:** 13472164188 - **Email:** 979662806@qq.com --- **III. Name of the Environmental Impact Assessment Agency** - **EIA Agency:** Shijiazhuang Houpu Environmental Engineering Co., Ltd. --- **IV. Access to the Draft EIA Report, Online Link for Public Comments, and Instructions for Reviewing the Paper Copy** - **Draft EIA Report Online Link:** [https://pan.baidu.com/s/1FyC3oQXa7GdKTcEUhzbb0A](https://pan.baidu.com/s/1FyC3oQXa7GdKTcEUhzbb0A) - **Extraction Code:** 0mrf - **Access to Paper Copy:** The draft EIA report is available for review at the premises of Xinji Aosen Steel Group Co., Ltd., located within the Xinji Circular Economy Industrial Park. --- **V. Scope of Public Consultation** This consultation is open to citizens, legal entities, and other organizations within the project's evaluation area. Additionally, it extends to any individuals or entities outside this scope who may have environmental concerns related to the project. --- **VI. How to Submit Feedback** Members of the public interested in providing comments on the project’s environmental impact can do so by contacting the project developer or the EIA agency via phone or email. --- **VII. Timeline for Public Input** Public comments will be accepted for a period of 5 working days starting from the date of this announcement. --- **Xinji Aosen Steel Group Co., Ltd.** January 1, 2021

2020-12-31

26

2020-11

Environmental Impact Assessment Report for the Comprehensive Product Quality Control Project at Xinji Aosen Steel Group Co., Ltd.

Environmental Impact Assessment Report for the Comprehensive Product Quality Control Project at Xinji Aosen Steel Group Co., Ltd.

2020-11-26

25

2020-11

Public Announcement on Public Participation in the Environmental Impact Assessment for the New 300,000-Ton Per Year Phosphating Wire Rod and Acid Recovery Project of Xinji City Aosen Metal Products Co., Ltd.

In accordance with the requirements of the "Measures for Public Participation in Environmental Impact Assessments" (Ministry Order No. 4) issued by the Ministry of Ecology and Environment, Xinjishi Aosen Metal Products Co., Ltd. is hereby announcing the progress of its new project—construction of a 300,000-ton-per-year phosphating wire rod facility along with an acid liquid recovery and recycling system—as well as the environmental impact assessment. This initiative aims to widely gauge public opinion and gather valuable feedback and suggestions from all sectors of society regarding both the project itself and environmental protection measures, while also inviting public oversight.

2020-11-25

17

2020-11

Xinji City Aosen Steel Co., Ltd. – Water and Soil Conservation Plan Report for the Pressurized Hot Retention Treatment Project of Steel Slag (Approval Draft)

Xinji City Aosen Steel Co., Ltd. – Water and Soil Conservation Plan Report for the Pressurized Hot Retention Treatment Project of Steel Slag (Approval Draft)

2020-11-17

< 1...383940...45 >